Skip to Content
Aquadam Steel Tanks
  • Home
  • About Us
  • Services/Products
    About us Partners Customers
    Products Services Help center
    Our blog Events Guides

    The team

    Since our inception in 1992, we have continually evolved and innovated to meet the ever-changing needs of our customers.  

    Discover our team
  • Blog/News
  • Contact
  • 0
  • Sign in
  • Quote Now
Aquadam Steel Tanks
  • 0
    • Home
    • About Us
    • Services/Products
    • Blog/News
    • Contact
  • Sign in
  • Quote Now

Ensure Peak Performance with Aquadam Services!


At Aquadam, we provide comprehensive water storage solutions, including reliable delivery, expert installation, and thorough inspection services. Whether you're setting up a tank for your home, business, or industrial needs, our team ensures that every step—from delivery and placement to ongoing maintenance—is handled with precision and care. 

Explore our range of services to find out how we can support your project with the highest standards of quality and professionalism.


Delivery Service​​​​ Installation Service​​​​ Inspection Service​​​​

Explore Our Services Get a Quote >

Delivery Service

At Aquadam, we offer reliable and efficient delivery services for our tanks. Our goal is to ensure that your tank arrives safely and is ready for installation. 


Contact Us:

For any further questions or to arrange your delivery, please contact our team. We are here to assist you and ensure your project proceeds seamlessly.


Discover More About Our Delivery S​​ervices 

  • Delivery with Bakkie
  • Delivery for Home Tanks
  • Delivery with Truck
  • Split Load Truck Delivery
  • Delivery Instructions
  • Contact Aquadam

Delivery with Bakkie

Service Overview:


Our bakkie delivery service is ideal for smaller tanks and deliveries where access may be restricted.


This service does not include labor, crane, or forklift for tank offloading. These must be provided by the customer at no additional cost.


Client Responsibilities:


Arrange for any necessary permits, access, or labor at least 48 hours before the scheduled delivery to avoid delays or additional costs for stand-down or return to the site.


Ensure that adequate offloading equipment is available on-site upon delivery.

Delivery for Home Tanks

Service Overview:


The delivery fee for home tanks includes both loading and offloading with labor, ensuring a seamless delivery process.


Tank placement is handled by our team, but please note that if a crane is needed to lift the tank over obstacles, the customer is responsible for the associated costs.


Client Responsibilities:


Coordinate any required permits, access, or entry codes for a team of five, including the driver.


Make sure that any obstacles requiring a crane for lifting are addressed, with the crane arranged at the customer’s expense.

Delivery with Truck

Service Overview:


Our truck delivery service is suited for larger tanks and bulk deliveries.


This service does not include labor, crane, or forklift for tank offloading. These must be provided by the customer at no additional cost.


Client Responsibilities:


Arrange for permits, access, or labor at least 48 hours before the scheduled delivery to avoid delays or additional costs for stand-down or return to the site.


Ensure that adequate offloading equipment is available on-site upon delivery.

Split Load Delivery with Truck

Service Overview:

Optimize your deliveries with our Split Load service, designed for dual cargo transport.

Note that customer must provide labor, crane, or forklift for offloading.

Client Responsibilities:

Arrange permits and access 48 hours prior to avoid delays or extra charges for stand-down or return trips.

Ensure that either you or a representative is present at the site to accept the materials upon their arrival and to sign the delivery note as proof of receipt, acknowledging that the materials have been received in good condition.

Important Delivery Instructions

Permits and Access:

​

To ensure a smooth delivery process, please arrange the necessary permits and site access at least 48 hours in advance. This will help avoid any delays or additional costs for stand-down or return trips.

​

Labour and Offloading Equipment:

​

Our delivery vehicles do not come equipped with cranes or labour for offloading. It is crucial that you arrange for labour and/or a forklift to be available on-site to facilitate the safe and secure offloading of the materials.

​

Acceptance of Materials:

​

Ensure either you or a representative is present to accept the materials upon delivery. Signing the delivery note will serve as proof of receipt and acknowledge that the materials have been received in good condition.

​

Storage and Safekeeping:

​

Make suitable arrangements for the storage and safekeeping of the materials until our installation team arrives. If any materials are found to be damaged, rusted, or stolen, report it promptly so we can take appropriate action.

​

Proof of Site Readiness:

​

To mobilize our installation teams, proof of site readiness is required. Our production manager will provide the relevant documents during their initial contact with you or your representative. This step ensures all necessary preparations are made for a smooth and successful installation process

Contact Us:

For any further questions or to arrange your delivery, please contact our team. We are here to assist you and ensure your project proceeds seamlessly.


Contact Us:

For any further questions or to arrange your delivery, please contact our team. We are here to assist you and ensure your project proceeds seamlessly.

Efficient Delivery Services Tailored to Your Needs

At Aquadam, we understand the importance of a smooth and timely delivery for your tank. Whether you're scheduling a home tank drop-off or coordinating a larger delivery, our team is dedicated to ensuring your tank arrives safely and is ready for installation. With clear client responsibilities and a range of delivery options, we make the process straightforward and hassle-free. Ready to get started? Let us help you bring your project to life with dependable delivery services.

Request a Quote

Installation Service

At Aquasteel (Pty) Ltd, we offer comprehensive steel tank installation services that ensure your project is completed efficiently and to the highest standards. Our installation process covers the tank shell, roof, and ring beam, including fitting essential components such as nozzles, ladders, level indicators, ventilators, and valves. Here’s a detailed overview of our service and the client's responsibilities:

Installation Service Overview

Scope of Work:

  • Installation of tank shell and roof
  • Construction of the ring beam
  • Fitting of nozzles, ladders, level indicators, ventilators, and valves

Contact Us:


For more information on our steel tank installation services or to discuss your specific project requirements, please contact our team. We are committed to providing the highest quality service to ensure your project's success.


Discover More About Our Installation Service

Client Responsibilities ​

To ensure a smooth installation process, clients must complete the following site preparations and meet specific requirements:

  • Site Preparations
  • Material Handling
  • Health & Safety

Site Preparations

Platform Preparation:

​

Level a suitable platform capable of supporting a 100kPa bearing capacity.

​

The platform must extend 2 meters beyond each side of the tank's diameter, making the prepared base 4 meters larger than the tank's diameter.

​

Compaction and Geo-technical Analysis:

​

The entire surface must be compacted to a minimum of 95% MODAASHTO and submitted to the site supervisor before installation begins.

​

Provide a Geo-technical analysis confirming that site-founding conditions comply with Aquasteel’s minimum requirements for the relevant tank model(s).


Excavation and Drainage:


Whenever possible, excavate the tank surface into natural ground rather than building it up with fill.

​

Install adequate drainage during excavation to divert rainwater away from the tank surface.


Fill and Retaining Walls:


If fill is used to level the surface, install appropriate retaining walls to maintain the integrity of the prepared surface.


Surface Cleanliness:


Ensure the entire prepared surface is clean and free of debris, including sticks, rocks, sharp objects, vegetation, or tree roots, which must be permanently removed.


Ring Beam for Commercial and Industrial Tanks:


Provide an engineered ring beam capable of supporting the tank's weight and preventing overturning during high winds, even when the tank is empty. objects, vegetation, or tree roots, which must be permanently removed.



Material Handling and Documentation

Storage and Security:


Materials delivered to the site will be stored at the client's risk against damage, rust, and theft. Payment must be completed before installation begins.


Compaction Proof:


Proof of compaction is required by Aquasteel before mobilizing installation teams. The site manager will provide the necessary documents during initial contact with the client or representative.


Material Acceptance:


Upon delivery, the client or a representative must accept the materials and sign the delivery note as proof of receipt.


Project Delays:


Aquasteel will not be liable for project delays caused by the unpreparedness of the site or incomplete documentation.

Health, Safety and Additional Requirements

HSE Compliance:


Compliance with special Health, Safety, and Environment (HSE) requirements, such as inductions or medicals, is excluded from this quotation unless specified otherwise.


Fittings and Flange Sizes:


All fittings and flange sizes/tables must be confirmed and signed off by the client during the quotation stage. Any deviations after order acceptance will require a new quotation before installation continues.


Power Supply:


Provide a suitable 220-volt power point located no more than 200 meters from the tank for the installation team's equipment. continues.


Special Documentation:


Special documentation requirements, including welding certificates or specific Quality Control Plans, are excluded from this quotation unless specified otherwise.


Jacking System/Scaffolding and Cranes:


Aquasteel will use its approved jacking system/scaffolding for tanks exceeding 5 rings. If a lifting crane is required, the client must provide it at no cost to Aquasteel.


Tank Commissioning:


Filling the tank for commissioning is the client's responsibility. Aquasteel will not be liable for costs if the tank needs to be emptied during commissioning before the sign-off certificate is issued.



Important Delivery Instructions

Permits and Access:

​

To ensure a smooth delivery process, please arrange the necessary permits and site access at least 48 hours in advance. This will help avoid any delays or additional costs for stand-down or return trips.

​

Labour and Offloading Equipment:

​

Our delivery vehicles do not come equipped with cranes or labour for offloading. It is crucial that you arrange for labour and/or a forklift to be available on-site to facilitate the safe and secure offloading of the materials.

​

Acceptance of Materials:

​

Ensure either you or a representative is present to accept the materials upon delivery. Signing the delivery note will serve as proof of receipt and acknowledge that the materials have been received in good condition.

​

Storage and Safekeeping:

​

Make suitable arrangements for the storage and safekeeping of the materials until our installation team arrives. If any materials are found to be damaged, rusted, or stolen, report it promptly so we can take appropriate action.

​

Proof of Site Readiness:

​

To mobilize our installation teams, proof of site readiness is required. Our production manager will provide the relevant documents during their initial contact with you or your representative. This step ensures all necessary preparations are made for a smooth and successful installation process

Contact Us:

For any further questions or to arrange your delivery, please contact our team. We are here to assist you and ensure your project proceeds seamlessly.


Contact Us:

For any further questions or to arrange your delivery, please contact our team. We are here to assist you and ensure your project proceeds seamlessly.

Ensure a Flawless Installation with our Expert Steel Tank Installation Services

At Aquadam, we take pride in offering top-tier steel tank installation services that meet the highest industry standards. From assembling the tank shell and roof to fitting nozzles, ladders, and valves, our comprehensive installation process ensures your project is completed efficiently and to specification. By partnering with us, you’ll benefit from our expertise and commitment to excellence, ensuring your tank is installed correctly and ready for use. Let's work together to bring your project to life with precision and care.

Request a Quote

Inspection Service

Ensure the Longevity and Performance of Your Water Storage Solutions


At Aquasteel (Pty) Ltd, we understand the critical role your water storage tanks play in your daily operations. Whether for domestic, commercial, or industrial use, maintaining the integrity and functionality of your tanks is essential. That's why we offer comprehensive Tank Inspection Services, designed to ensure your tanks remain in optimal condition for years to come.

Annual and Five-Year Tank Inspections

Our Tank Inspection Services are tailored to meet your specific needs, with options for either annual or five-year inspections. Regular inspections help detect potential issues early, ensuring that your tanks operate efficiently and safely.


Contact Us:

Contact us now to learn more about our Tank Inspection Services and to book your inspection.


Discover More About Our Inspection Service

  • Annual Inspections
  • 5 Year Inspections
  • Inspection Process
  • Inspection Preparation

Annual Tank Inspections

Why Choose Annual Inspections?


Early Detection of Issues: 

Annual inspections allow for the prompt identification of potential problems, preventing costly repairs or replacements.


Maintain Warranty Compliance: 
Regular inspections are a key requirement for maintaining your tank's warranty, protecting your investment.


Peace of Mind: 
Enjoy the assurance that your tank is being monitored and maintained by professionals, ensuring its safe and efficient operation.


What's Included in an Annual Inspection?


Structural Integrity: 
Assessing the tank's firmness and shape to ensure it remains free from deformities.


Bolt and Joint Check: 
Ensuring all bolts and joints are tight and free from corrosion.


Pipe and Flange Examination: 
Checking for leaks, corrosion, or wear and tear.


Roof and Ladder Inspection: 
Verifying the stability and safety of roof structures and access points.

Five-Year Tank Inspections

Why Opt for a Five-Year Inspection?


Comprehensive Assessment: 
A more detailed inspection that covers all aspects of the tank's condition, ensuring long-term durability.


Strategic Maintenance Planning: 
Ideal for planning extensive maintenance and upgrades, keeping your tank in top condition.


What's Included in a Five-Year Inspection?


Detailed Structural Review: 
Thoroughly examining the tank's structural integrity.


Comprehensive Bolt and Joint Analysis: 
In-depth inspection of all bolts and joints for signs of wear or corrosion.


Extensive Pipe and Flange Check: 
Detailed examination of pipes and flanges for any issues.


Full Roof and Ladder Review: 
Comprehensive inspection of roof structures and access points.


Interior Examination: 
Inspecting the tank's interior, including the PVC liner, sand floors, and vortex-inhibitor plates.



Inspection Process

One-Day Completion: 

Our efficient inspection process typically takes one day.


Professional and Approved Inspectors: 

All inspections are conducted by approved Aquasteel (Pty) Ltd dealers or representatives.


Detailed Reporting: 

Receive a thorough report outlining any issues and recommended actions.

Preparing for Your Inspection

Site Preparation: 

Ensure the inspection area is free from debris, combustible materials, and obstructions.


Tank Pad Verification: 

Confirm the base has not been disturbed or eroded, and all protective aggregates are in place.


Accessibility: 

Ensure clear access to the tank for a seamless inspection process.



Important Delivery Instructions

Permits and Access:

​

To ensure a smooth delivery process, please arrange the necessary permits and site access at least 48 hours in advance. This will help avoid any delays or additional costs for stand-down or return trips.

​

Labour and Offloading Equipment:

​

Our delivery vehicles do not come equipped with cranes or labour for offloading. It is crucial that you arrange for labour and/or a forklift to be available on-site to facilitate the safe and secure offloading of the materials.

​

Acceptance of Materials:

​

Ensure either you or a representative is present to accept the materials upon delivery. Signing the delivery note will serve as proof of receipt and acknowledge that the materials have been received in good condition.

​

Storage and Safekeeping:

​

Make suitable arrangements for the storage and safekeeping of the materials until our installation team arrives. If any materials are found to be damaged, rusted, or stolen, report it promptly so we can take appropriate action.

​

Proof of Site Readiness:

​

To mobilize our installation teams, proof of site readiness is required. Our production manager will provide the relevant documents during their initial contact with you or your representative. This step ensures all necessary preparations are made for a smooth and successful installation process

Contact Us:

For any further questions or to arrange your delivery, please contact our team. We are here to assist you and ensure your project proceeds seamlessly.


Contact Us:

For any further questions or to arrange your delivery, please contact our team. We are here to assist you and ensure your project proceeds seamlessly.

Schedule Your Tank Inspection Today

Don't wait until minor issues become major problems. Schedule your tank inspection today and protect your investment. Whether you choose an annual inspection for ongoing maintenance or a five-year inspection for a comprehensive review, Aquasteel (Pty) Ltd is here to ensure your tanks are always in top condition.

Request a Quote

Aquadam Logo


Water Storage Is Not A Product. It Is A Risk Decision.

Aquadam engineers water systems that transfer risk away from 

the owner — and into performance-backed steel infrastructure.

USEFUL LINKS:

Home
About
Legal
Contact Us
Get a Quote 

311 Alwyn Str, Waltloo • Pretoria• South Africa

sales@aquadam.co.za

Copyright © Aquadam Steel Tanks Int. 2026
Powered by Odoo - The #1 Open Source eCommerce